بخش زیر بنایی

* General Administration of Roads and Urban Development of Alborz Province
۱- Mesbah
Due to the location of Sulaymaniyah Palace, Misbah Grand Mosque and Misbah's old bath, there is a great
potential to turn this complex into a tourist and tourism place. Despite the reconstruction of these historical
places, the relevant income is provided through tourists' visits (buying tickets)
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Karaj – Mesbah ۱۴۴۹۸۵ ۵۱ ۴۱
۲- Commercial-administrative-entertainment complex
This land plan with an area of ۸ hectares belongs to the road and urban development suitable for the
implementation of a commercial, administrative, entertainment center and creating suitable spaces for
service and entertainment per capita and creating employment. In this plan, with an infrastructure of ۲۴,۰۰۰
square meters and a useful area for an administrative-commercial complex with ۷,۲۰۰ square meters on ۴
floors; Also, ۳ cinema halls, an amphitheater and a library with an area of ۵۰۰ square meters are planned.
Construction of green space and park in the area is also available. The income of this plan is considered
through the sale of the units of this center
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Karaj- Hassan Abad ۳۷۱۷۱۰۸ ۱۲ ۲۳
۳- Creation of various promenades along the Karaj River
The scope of the project has the pristine and beautiful nature of the Chalus road, the Karaj river, suitable
weather, unique pastures and vegetation, convenient and easy access from nearby cities and all the
surrounding cities, and proper security, which attracts countless numbers of tourists every year. It will be
tourists
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Alborz-Asara-Ray Zameen province ۳۱۷۲۶۹۹ ۷۱ ۲۷
۴- Southern belt of Karaj
This plan includes the leveling, infrastructure of the south belt of Karaj along with guardrails, asphalting
and road accessories for a length of ۲۸ km, ۳ lanes and two return lanes, which started from parts of the
extension of Hemet highway on the north side of the highway and after passing From the southern part of
the highway, it is connected to the Tehran Karaj highway in the western part. The income of this plan is
through toll collection
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Karaj city ۵۷۰۲۰۸۲ ۹۸ ۲۲
۵- Mohammad Shahr - Mahedasht bypass
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Karaj ۵۰۲۹۴۱۹ ۹۷ ۲۲
* Alborz Province Regional Water Company
۱- Nationwide water supply ring
The product of the project is sanitary drinking water, which is purified by the components of the project and
transported to the places of consumption. According to the considerations of the Ministry of Energy, there is
no possibility of guaranteed purchase of water from the investor. Therefore, according to the agreements
made, it is stipulated that the project will be handed over to the investor in a self-governing manner (mutual
sale) and in exchange for handing over other benefits (handover of wastewater concessions, electricity
production, etc.) or the assets of the regional water company
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Alborz province ۷۳۹۰۹۳۶۷ ۱۰۶ ۳۰
* Alborz Water and Wastewater Company
۱- Implementation of Nazarabad sewage collection, transfer and treatment facilities
The design of the wastewater collection and treatment network of Nazarabad city using the conventional
collection network method and with a total length of piping equal to ۳۵۰ km of the wastewater collection
The project starts from Tehran Karaj highway and after passing through the western areas of Mohammad
Shahr and Mahdasht, it will be connected to the Eshtehard-Shahriar axis. Among the benefits of
implementing this plan, we can mention the reduction of travel time, fuel consumption and air pollutants and
increase in safety. This plan includes leveling, infrastructure along with guard rails, asphalting and road
accessories for a length of ۲۱ kilometers, ۳ lanes and in two return lanes. The income can be obtained through
tolls
network and ۶.۴ km of the wastewater transfer line and the construction of a pumping station at the entrance
of the wastewater treatment plant and the implementation of ۲۴,۵۰۰ sewage branching lines and Construction
of a treatment plant with two modules with the MLE treatment process of the first module with a capacity of
۱۹,۴۳۰ cubic meters per day (equivalent to ۱۳۰,۴۰۰ people)
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Nazar abad ۵۱۴۳۷۱۹ ۱۰۸ ۲۱
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Eshtehard ۲۷۳۸۹۰۸ ۱۰۸ ۲۳
۳- Package of sewage treatment plant, Koch Hisar, Nazarabad
The capacity of each package is ۴۵۰ cubic meters per day and the purification process is activated sludge
using extensive aeration with the removal of nutrients. This device is a wide set of equipment to eliminate
chemical, physical and biological pollutants from wastewater, which has different parts according to the type
of wastewater
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Nazar abad ۷۸۱۰۱ ۱۰۷ ۱۵
۴- Collection and transfer of wastewater, installation of branches and construction of sewage
treatment plant in Hashtgerd city
The land required for the project has been located and its area is about ۷ hectares. Hashtgerd city is the center
of Savojbolagh city, which is located in the northwest of Karaj city, and its height is about ۱۲۰۰ meters
compared to the sea level. This area has a general slope from north to south. The height difference between
the highest point and the lowest point is ۱۰۰ meters
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
۲- Sewerage of Eshtehard city
In general, ۶۸ kilometers remain from the construction of the sewage collection network and transmission
line. The current plan is for the construction of ۲ treatment plant modules with a capacity of ۶۲۰۰ cubic
meters per day and with the SBR wastewater treatment plant process
Hashtgerd ۳,۹۴۳,۸۴۵ ۶۰ ۲۴
* Electricity distribution company of Alborz province
۱- Construction of CHP power plant
The capacity of this power plant is ۳.۶ megawatts, which, including ۳۵۰ working days of ۲۴ hours with ۸۶%
efficiency, produces ۲۷,۲۱۶,۰۰۰ kilowatts of electricity per year. For each megawatt of electricity produced,
a space equivalent to ۲۰۰ square meters is sufficient. Considering the development plan, the land considered
for the plan is ۱۸۰۰ square meters. The plan's income is from the guaranteed sale of electricity, and if thermal
energy is sold to the applicant units, the total amount will be added to the plan's income
The location of the project
Estimated total
costs (million
Rials)
Payback
period
(months)
Project internal rate
of return (IRR)
percent
Alborz province ۵۲۲۸۵۱ ۵۳ ۱۹